 The daggerboard slot is finished and the keel is installed.

Now to decide. Sand and paint before flipping to finish the interior?? Brass 1/2 round rub strip to be attached to the keel.

Monday, August 12, 2013


The dagger board case is installed. The interior is twice epoxy coated before assembly. Cutting the slot in the hull took a little extra courage. Will now flip the boat and clean up the slot and install the keel strip. In case you noticed the dagger board is slightly offset to not interfere with the keel.

Friday, August 9, 2013

 Installing the sides of the flotation tanks that become the seats.
They are shaped to fit then glued and glassed to the hull on both sides.
Beg and borrow as many clamps as possible, all types.