Saturday, July 6, 2013

Back to the interior.

Bow flotation chamber and bow piece are installed. Tab for mast support is drilled to fit later.

Rear knees are installed as is the gunnel return. Screw holes filled with purpleheart plugs.  Just happened to have  enough for a few plugs.
And now moving on to the interior. This is the start of the framing for the flotation tank/seating for both sides.